Friday, 14 October 2011

Floor and roof(-ish)

Another month - where did that go? The weekend of 16/17 September was a regional walk organised by the Condom group with much wining and dining and some dancing. 200 on a guided walk on Saturday and over 500 for a marked route on Sunday. We did our bit to help, especially the wining and dining!

Then we took the caravan for its third inspection and it passed, but still waiting for the paperwork to come through so we can get French plates.

Have laid the floor insulation - 100 square metres and 2 layers, so no mean feat. A serious glitch when we opened the last pack of slabs to find them all stuck together! The screed was due in 2 days, but we got it replaced and all set just in time. Now waiting for the screed to dry completely so we can start laying flooring, maybe December (Judy has just said "no chance").

We nearly have the roof tiled - long tales of woe from the roofer to explain why it's a month late. We're working on our bathroom which had every fiddly bit we're ever likely to have to do, so a steep learning curve. Waiting to have the water and electricity connected properly, then we can camp in the house at last.

Spent a few days back in Plymouth as Chris was working. Picked up our meagre furniture and a load of bamboo flooring which is much cheaper in UK. Had hired a huge French van which hardly fitted down the Devon lanes. Easy driving in France, though.

One disaster - Chris dropped the netbook and wrecked the screen, so now computer-less.

Summer fete-ing has finished, quilles has been replaced by cards (belote), tried archery and nearly killed a hare and a deer - but that was in the car on the way home!

Have found a wonderful lady who does French lessons, so that's Wednesday evenings and Friday afternoons booked. Badminton on Tuesday evenings, so still keeping busy.


Sent from my HTC

Tuesday, 13 September 2011

Windows and doors

Well here we are again after a few weeks.  I'm trying to remember what we've done in the time - shopping, partying, planning (which takes an awfully long time understanding French ways of doing things), started to get the bathroom in - took a long time working out how to do the loo, a bit of gardening (we have beans and lettuce) and have built a set of steps down to the barn to enable us to get down without breaking our necks on the slope.  These have not been finished, a bit more rock humping to go.  


We still haven't managed to crack French bureaucracy re the caravan but have another inspection next week (no. 3) and are hopeful.

Last week saw a major breakthrough - we now have windows!!  They went in incredibly quickly which was good cos it enabled us to spend 2 days with our friend Dave watching the marathon in Bordeaux ( he was there supporting a mate).  We also managed to squeeze in an afternoons shopping at the big B & Q type store. 



We are very hopeful that the roofing firm will arrive soon which will be another milestone.

We've done quite a bit of walking with a group and this coming weekend is a big regional three days walking which we are helping to organise.  Last one of these had about 800 people turn up!  We also spent a day walking to a concert in a chateau followed by wine and picnic, then a visit to their winery and a display by dressage horses.  It got so hot that of the 60 people who walked to the concert, only 8 walked back - we were two of them!  Lots of sweat and water!  Another concert in the evening and a meal (of course) completed the day.


The other thing that has taken some time on a Friday night is our game of Quilles which I think I explained in a previous blog.  We've become hooked and even played in a singles tournament (usually teams of 3).  J won two out of four games, C none.  Hee Hee!  Stayed for the meal where the wine and armagnac flowed freely.

And now it's competition time :  we bet that no-one can beat spending 192 euros in one hit in a Lidl!  Would you want to?  We have also visited 2 Lidl in one day.  Are these two a record?  Prize - free parking in a Lidl of your choice.



Wednesday, 10 August 2011

Shell complete!

Hooray the rain and mud went away allowing work to progress apace.  The boys worked really hard starting at 8am and not finishing until 8.30 or even 9pm.  All went relatively smoothly apart from small details like one wall didn't have the door in it to our bathroom!  Fortunately there wasn't a post in the way and a chain saw soon sorted that one out.  One window was too small but ditto with the chain saw - the beauties of a wooden house!

While all this work was going on we have been supervising, rushing around organising next bits like floors, stove, wood for lining windows etc. etc.  Also been having a bit of fun - Montreal has been 'en Fete' with lots going on including mega eating and drinking.  We've done our best to keep the English end up by appearing every day.  Also had some jolly social occasions with French who speak English.  I'm afraid the French isn't up to a whole evening although we do try.

The last roof panel went on 3rd August to much cheering and rejoicing.  They then spent a day tidying up, putting the membrane on the roof and generally nailing and glueing bits they'd missed. 

Now it's mainly down to us with a little bit of help from roofers and stove installers and plasterers.  You will note on the last piccy that the house is totally enclosed in a waterproof membrane - yes we do still have windows but have covered them to keep the rain out until window installers come at the end of August.  So for now there's a big white blob on the landscape which is causing some interest.

I have to say that we are enjoying the experience so far in spite of language difficulties - social life is good - and although the whole project is somewhat daunting it's a challenge and we can do it at our own pace once we have a loo and shower installed.  At the moment we're camping on the site which means using our little shower and the pissoir up the road which although isn't too bad for a French loo it isn't wonderful!  However being on site is much more convenient and cheaper so I think we'll stay here. 


There probably won't be an entry for some time as things will progress slowly but sometime in September after the roof has been done and the windows and doors are in.


Saturday, 30 July 2011

Rain, mud and a bit more house!

Monday morning and it rained.  It had rained all night and didn't want to stop.  We had the next lorry of panels to unload, and the scaffolding arrived.  The soil being clay was soon turned into a gooey, claggy mass - lovely.  However the boys soldiered on but progress was woefully slow.  Tuesday dawned even wetter, we even had to move the caravan cos the awning flooded.  Ground floor of the house was a swimming pool with ever more mud everywhere.  But we gave them lots of food and beer and they seemed to cope ok.  


Wednesday and no rain!!  Rooms upstairs starting to take shape and things going quicker and with a bit more cheerfulness.  As the boss said 'the radio is on and they're singing so it must be good.'  


End of Thursday and the first roof panel is ready to go.  Problem being how to get it there?  Solution to drill some holes and rope it to the manitou then float it over the top.  Was 9 o'clock when they finally got it into place.  Hooray!!


Friday was back to what we expect of France in July - wall to wall sunshine, warmth, lovely.  By going home time the first side of roof was nearly complete.  We spent the day washing all the mud out of the downstairs and clearing the site of soggy plastic wrapping etc.  In the evening we went to a saxaphone concert under the arches in the village - perfect end to the day.


Next week should see it off in 2 or 3 days. Then the hard work for us begins.



Thursday, 21 July 2011

The house arrives by lorry!

Well, it's been a long time since our last post, and we've been busy chasing building things and getting estimates, which is very difficult in a new country where we don't speak the language very well!  It's a lot to organise and check carefully.  We've also been making progress with getting the car registered in France (we now have a number) and very slow progress with the caravan. We've also managed to enjoy ourselves with the occasional party, concert and jazz evening in a very buzzy bar in a village 12km away.  We've met some really nice people along the way.  The weather has been a bit iffy, but still mostly warm. 


We also had a nice day with a local eco group and went for a walk through the sunflowers - spot the faces!

The ground floor of the house arrived at the weekend on a lorry from Germany driven by a Polish guy who spoke neither English or French, and the team who are putting it up came on Monday 18th July, as planned.   Unfortunately Judy had a horrible tummy bug on Sunday night (courtesy of Chris who had it on Friday) and missed most of the excitement of the first day. Monday was setting up and measuring etc.  The first panel went up on Tuesday morning to much cheering!  Things have progressed as fast as the weather will allow - blustery showers, very English.  They don't finish until about 8.30 in the evening and then arrive back chez camping for large amounts of sustenance  - we're camp chefs and yes they are still alive.
They leave today (Thursday) for the weekend  but will hopefully have the beams for the second stage done.  It's been an incredibly busy few days but at last things are coming to fruition and we can see it grow.   




Wednesday had both fun and frustration.  We took the caravan for yet another inspection to get it 'Frenchified' and the inspector was a very jolly chap who just wanted the vehicle number in several places.  We'd had it engraved on the chassis but that wasn't enough.  So, he told us what to do but we have to wait for another appointment and drag the caravan down to Auch again (about 1 hour away).


There was a really good medieval evening in Montreal where they handed out free medieval dress and there were lots of medieval happenings - very jolly, but we had to get back and cook!




There's another in 2 week's time and a series of Thursday evening walks which we're going to.  Will keep you posted.





Friday, 24 June 2011

Progress in France

Work has continued slowly with lots of bits not really visible as it's the foundations.  Also, the weather has been mixed with occasional wet days. And lots of public holidays: Ascension Day is a Thursday so no-one works on the Friday either, so a 4-day weekend.  The house kit is due to arrive on 18th July and the team here say all should be on schedule.

We've been sorting stones saved from demolishing the top of a wall and Chris has been discovering the joys of French plumbing.  While pipework in UK is all 15mm, here you have to choose between 12, 14, 16, 18...  a-aghh!  Got there eventually and we now have a washing machine and sink down in the barn - luxury!

Went to a 'Course Landaise' which is not bull-fighting but more gymnastics around a charging cow - weird but good fun, especially when the cows don't do as expected.


Doing lots of paperwork and chasing people, so not a dull moment!

We were invited out for our wedding anniversary and spent a great evening with mostly French people at a lovely old (12th century) house in the country.  Everyone very friendly, even got offerred a bed for the winter if our house isn't ready.  Will have to throw a party for them soon.

Today the concrete arrived for the slab on which the house will sit.
Later today - we've christened the slab with a bottle of bubbly shared with the mason and his side-kick.  Hooray!!


The green stuff is an eco-anti-termite coating (oxymoron there?) and the sticky-out bits will be terraces.  House will arrive in 3 weeks, so lots more planning to do with visits to IKEA, Leroy-Merlin (the French B&Q), builders merchants etc.





Wednesday, 1 June 2011

Another party - and progress.


We were invited out to lunch at a hotel training college on Friday and this turned out to be another surprise birthday party organised by our friend Héléne. Nine people for a 3-hour lunch and Hélène had brought a cake and bubbles. The others were all very jolly and tolerated our poor French even though they all could speak Anglais.

In the evening we went to the opening of 5 simultaneous art exhibitions in an old abbey and met some of them again and some others, along with nibbles and drinks. Doing the culture thing is a good way to meet people.

J's birthday was hot and sunny and very relaxed with pink bubbly and steak. We now have our own phone and internet on the barn, so Judy did her ET impression and phoned home.





On Monday the big machine arrived to put in the piles and we went to Auch to register in the French health system, taking birth and marriage certificates. Monday night we watched terrible storms to the south and east but our patch stayed largely dry. On Tuesday the piles went in - HOORAY!! - and we towed the caravan to Pau to be inspected for registering it in France.  After much trepidation on our part we had no problem getting the necessary certificate of conformity.  Step 1 in a 3-step process complete.  More paperwork to come.