Our friends, Keith and Julia, from Plymouth came to visit for a week, including a weekend of partying for the 'Flamme d'Armagnac' of which more later. This put the pressure on us to really get the house sorted with a shower and a makeshift kitchen. This we managed to do the Monday before they arrived on Wednesday! Phew! It would have been a little cramped in the caravan. We were given some old kitchen units and a sink by a builder friend here, so that helped. We now have a shower...
...and a temporary kitchen in the utility room with light which was a welcome addition...
... and some furniture only light here being standard lamps but at least we have power.
So, we spent most of the time fixing external insulation to the house. We got 4 complete layers done which was more than expected. If it takes 4 people 4 days to fix 4 layers... ? It's about one third of the total required so a bit left to do. We're waiting for builder friend to come and fix some scaffolding but he's become French in that you never know when he'll turn up. Demain or Demain....
But we also managed to walk (Keith, Julia and Judy and a few hundred others)
and cycle (Chris) which included breakfast - bacon butties and red wine - in a distillery.
Then, it was party time in the evening. A meal for 500 with music and dancing and of course plenty of liquid refreshment! Good time was had by all.
The Sunday was another walk (stroll) to a wine tasting and back for large lunch (with more liquid refreshment). Not much happened that afternoon surprisingly.
So now we're on our own again and hoping to complete the external insulation before we return to UK for Xmas.
Will post on progress before we leave.
Sunday, 27 November 2011
Sunday, 6 November 2011
Camping in the house
We now have water and electricity connected and on 29th October - the night the clocks changed - we spent our first night in the house. Had the loo connected and cold water - luxury! Celebrated with a bottle of pink bubbly and a game of Scrabble (in English) in bed. As you can see from the rubble stacked around it's not exactly luxury living! Still it's not the caravan which is becoming more important now we're getting into winter. The poppies have finally given up as have the french beans but the weeds live on. How do they do that?
Connected a temporary hot water system the next day, so even better. Next week's push is to get the shower installed and tiled and to get a temporary kitchen up and running so we can move out of the caravan permanently. We do have a working bread maker so that's a start.
Last week was spent plaster-boarding and filling the gaps, strange French system, you don't use plaster, just fill the joins and then put a kind of primer over it. Jury's out on the finish at the moment. Also managed to get power circuits in all rooms, but not complete, just enough to get by, at least we can have the computer and telephone in the house. The lighting is more tricky but started - that will be a breakthrough so we're not stumbling around in the dark.
Finally have the caravan registered in France - a great success as it was a very tortuous process taking six months but the paperwork came through at last so we celebrated with a very nice lunch with two friends at a catering school. Cheap and extremely good.
Picture below is of a walk with the local group.
We're still going walking, playing badminton, doing our French lessons and playing cards (badly) but the card players are very tolerant - especially when we lose - and try to explain the rules to Belote and some of the playing tricks (it's quite difficult to understand what they say as it's the accent and they talk at a hundred miles an hour). It's all good fun. We managed to win one round out of four last week, so two bottles of wine were the prize so it's not all bad.
Connected a temporary hot water system the next day, so even better. Next week's push is to get the shower installed and tiled and to get a temporary kitchen up and running so we can move out of the caravan permanently. We do have a working bread maker so that's a start.
Last week was spent plaster-boarding and filling the gaps, strange French system, you don't use plaster, just fill the joins and then put a kind of primer over it. Jury's out on the finish at the moment. Also managed to get power circuits in all rooms, but not complete, just enough to get by, at least we can have the computer and telephone in the house. The lighting is more tricky but started - that will be a breakthrough so we're not stumbling around in the dark.
Finally have the caravan registered in France - a great success as it was a very tortuous process taking six months but the paperwork came through at last so we celebrated with a very nice lunch with two friends at a catering school. Cheap and extremely good.
Picture below is of a walk with the local group.
We're still going walking, playing badminton, doing our French lessons and playing cards (badly) but the card players are very tolerant - especially when we lose - and try to explain the rules to Belote and some of the playing tricks (it's quite difficult to understand what they say as it's the accent and they talk at a hundred miles an hour). It's all good fun. We managed to win one round out of four last week, so two bottles of wine were the prize so it's not all bad.
Friday, 14 October 2011
Floor and roof(-ish)
Another month - where did that go? The weekend of 16/17 September was a regional walk organised by the Condom group with much wining and dining and some dancing. 200 on a guided walk on Saturday and over 500 for a marked route on Sunday. We did our bit to help, especially the wining and dining!
Then we took the caravan for its third inspection and it passed, but still waiting for the paperwork to come through so we can get French plates.
Have laid the floor insulation - 100 square metres and 2 layers, so no mean feat. A serious glitch when we opened the last pack of slabs to find them all stuck together! The screed was due in 2 days, but we got it replaced and all set just in time. Now waiting for the screed to dry completely so we can start laying flooring, maybe December (Judy has just said "no chance").
We nearly have the roof tiled - long tales of woe from the roofer to explain why it's a month late. We're working on our bathroom which had every fiddly bit we're ever likely to have to do, so a steep learning curve. Waiting to have the water and electricity connected properly, then we can camp in the house at last.
Spent a few days back in Plymouth as Chris was working. Picked up our meagre furniture and a load of bamboo flooring which is much cheaper in UK. Had hired a huge French van which hardly fitted down the Devon lanes. Easy driving in France, though.
One disaster - Chris dropped the netbook and wrecked the screen, so now computer-less.
Summer fete-ing has finished, quilles has been replaced by cards (belote), tried archery and nearly killed a hare and a deer - but that was in the car on the way home!
Have found a wonderful lady who does French lessons, so that's Wednesday evenings and Friday afternoons booked. Badminton on Tuesday evenings, so still keeping busy.
Sent from my HTC
Then we took the caravan for its third inspection and it passed, but still waiting for the paperwork to come through so we can get French plates.
Have laid the floor insulation - 100 square metres and 2 layers, so no mean feat. A serious glitch when we opened the last pack of slabs to find them all stuck together! The screed was due in 2 days, but we got it replaced and all set just in time. Now waiting for the screed to dry completely so we can start laying flooring, maybe December (Judy has just said "no chance").
We nearly have the roof tiled - long tales of woe from the roofer to explain why it's a month late. We're working on our bathroom which had every fiddly bit we're ever likely to have to do, so a steep learning curve. Waiting to have the water and electricity connected properly, then we can camp in the house at last.
Spent a few days back in Plymouth as Chris was working. Picked up our meagre furniture and a load of bamboo flooring which is much cheaper in UK. Had hired a huge French van which hardly fitted down the Devon lanes. Easy driving in France, though.
One disaster - Chris dropped the netbook and wrecked the screen, so now computer-less.
Summer fete-ing has finished, quilles has been replaced by cards (belote), tried archery and nearly killed a hare and a deer - but that was in the car on the way home!
Have found a wonderful lady who does French lessons, so that's Wednesday evenings and Friday afternoons booked. Badminton on Tuesday evenings, so still keeping busy.
Sent from my HTC
Tuesday, 13 September 2011
Windows and doors
Well here we are again after a few weeks. I'm trying to remember what we've done in the time - shopping, partying, planning (which takes an awfully long time understanding French ways of doing things), started to get the bathroom in - took a long time working out how to do the loo, a bit of gardening (we have beans and lettuce) and have built a set of steps down to the barn to enable us to get down without breaking our necks on the slope. These have not been finished, a bit more rock humping to go.
We still haven't managed to crack French bureaucracy re the caravan but have another inspection next week (no. 3) and are hopeful.
Last week saw a major breakthrough - we now have windows!! They went in incredibly quickly which was good cos it enabled us to spend 2 days with our friend Dave watching the marathon in Bordeaux ( he was there supporting a mate). We also managed to squeeze in an afternoons shopping at the big B & Q type store.
We are very hopeful that the roofing firm will arrive soon which will be another milestone.
We've done quite a bit of walking with a group and this coming weekend is a big regional three days walking which we are helping to organise. Last one of these had about 800 people turn up! We also spent a day walking to a concert in a chateau followed by wine and picnic, then a visit to their winery and a display by dressage horses. It got so hot that of the 60 people who walked to the concert, only 8 walked back - we were two of them! Lots of sweat and water! Another concert in the evening and a meal (of course) completed the day.
The other thing that has taken some time on a Friday night is our game of Quilles which I think I explained in a previous blog. We've become hooked and even played in a singles tournament (usually teams of 3). J won two out of four games, C none. Hee Hee! Stayed for the meal where the wine and armagnac flowed freely.
And now it's competition time : we bet that no-one can beat spending 192 euros in one hit in a Lidl! Would you want to? We have also visited 2 Lidl in one day. Are these two a record? Prize - free parking in a Lidl of your choice.
Wednesday, 10 August 2011
Shell complete!
Hooray the rain and mud went away allowing work to progress apace. The boys worked really hard starting at 8am and not finishing until 8.30 or even 9pm. All went relatively smoothly apart from small details like one wall didn't have the door in it to our bathroom! Fortunately there wasn't a post in the way and a chain saw soon sorted that one out. One window was too small but ditto with the chain saw - the beauties of a wooden house!
While all this work was going on we have been supervising, rushing around organising next bits like floors, stove, wood for lining windows etc. etc. Also been having a bit of fun - Montreal has been 'en Fete' with lots going on including mega eating and drinking. We've done our best to keep the English end up by appearing every day. Also had some jolly social occasions with French who speak English. I'm afraid the French isn't up to a whole evening although we do try.
The last roof panel went on 3rd August to much cheering and rejoicing. They then spent a day tidying up, putting the membrane on the roof and generally nailing and glueing bits they'd missed.
Now it's mainly down to us with a little bit of help from roofers and stove installers and plasterers. You will note on the last piccy that the house is totally enclosed in a waterproof membrane - yes we do still have windows but have covered them to keep the rain out until window installers come at the end of August. So for now there's a big white blob on the landscape which is causing some interest.
I have to say that we are enjoying the experience so far in spite of language difficulties - social life is good - and although the whole project is somewhat daunting it's a challenge and we can do it at our own pace once we have a loo and shower installed. At the moment we're camping on the site which means using our little shower and the pissoir up the road which although isn't too bad for a French loo it isn't wonderful! However being on site is much more convenient and cheaper so I think we'll stay here.
There probably won't be an entry for some time as things will progress slowly but sometime in September after the roof has been done and the windows and doors are in.
Saturday, 30 July 2011
Rain, mud and a bit more house!
Monday morning and it rained. It had rained all night and didn't want to stop. We had the next lorry of panels to unload, and the scaffolding arrived. The soil being clay was soon turned into a gooey, claggy mass - lovely. However the boys soldiered on but progress was woefully slow. Tuesday dawned even wetter, we even had to move the caravan cos the awning flooded. Ground floor of the house was a swimming pool with ever more mud everywhere. But we gave them lots of food and beer and they seemed to cope ok.
Wednesday and no rain!! Rooms upstairs starting to take shape and things going quicker and with a bit more cheerfulness. As the boss said 'the radio is on and they're singing so it must be good.'
End of Thursday and the first roof panel is ready to go. Problem being how to get it there? Solution to drill some holes and rope it to the manitou then float it over the top. Was 9 o'clock when they finally got it into place. Hooray!!
Friday was back to what we expect of France in July - wall to wall sunshine, warmth, lovely. By going home time the first side of roof was nearly complete. We spent the day washing all the mud out of the downstairs and clearing the site of soggy plastic wrapping etc. In the evening we went to a saxaphone concert under the arches in the village - perfect end to the day.
Next week should see it off in 2 or 3 days. Then the hard work for us begins.
Thursday, 21 July 2011
The house arrives by lorry!
Well, it's been a long time since our last post, and we've been busy chasing building things and getting estimates, which is very difficult in a new country where we don't speak the language very well! It's a lot to organise and check carefully. We've also been making progress with getting the car registered in France (we now have a number) and very slow progress with the caravan. We've also managed to enjoy ourselves with the occasional party, concert and jazz evening in a very buzzy bar in a village 12km away. We've met some really nice people along the way. The weather has been a bit iffy, but still mostly warm.
The ground floor of the house arrived at the weekend on a lorry from Germany driven by a Polish guy who spoke neither English or French, and the team who are putting it up came on Monday 18th July, as planned. Unfortunately Judy had a horrible tummy bug on Sunday night (courtesy of Chris who had it on Friday) and missed most of the excitement of the first day. Monday was setting up and measuring etc. The first panel went up on Tuesday morning to much cheering! Things have progressed as fast as the weather will allow - blustery showers, very English. They don't finish until about 8.30 in the evening and then arrive back chez camping for large amounts of sustenance - we're camp chefs and yes they are still alive.
They leave today (Thursday) for the weekend but will hopefully have the beams for the second stage done. It's been an incredibly busy few days but at last things are coming to fruition and we can see it grow.
Wednesday had both fun and frustration. We took the caravan for yet another inspection to get it 'Frenchified' and the inspector was a very jolly chap who just wanted the vehicle number in several places. We'd had it engraved on the chassis but that wasn't enough. So, he told us what to do but we have to wait for another appointment and drag the caravan down to Auch again (about 1 hour away).
There was a really good medieval evening in Montreal where they handed out free medieval dress and there were lots of medieval happenings - very jolly, but we had to get back and cook!
There's another in 2 week's time and a series of Thursday evening walks which we're going to. Will keep you posted.
We also had a nice day with a local eco group and went for a walk through the sunflowers - spot the faces!
The ground floor of the house arrived at the weekend on a lorry from Germany driven by a Polish guy who spoke neither English or French, and the team who are putting it up came on Monday 18th July, as planned. Unfortunately Judy had a horrible tummy bug on Sunday night (courtesy of Chris who had it on Friday) and missed most of the excitement of the first day. Monday was setting up and measuring etc. The first panel went up on Tuesday morning to much cheering! Things have progressed as fast as the weather will allow - blustery showers, very English. They don't finish until about 8.30 in the evening and then arrive back chez camping for large amounts of sustenance - we're camp chefs and yes they are still alive.
They leave today (Thursday) for the weekend but will hopefully have the beams for the second stage done. It's been an incredibly busy few days but at last things are coming to fruition and we can see it grow.
Wednesday had both fun and frustration. We took the caravan for yet another inspection to get it 'Frenchified' and the inspector was a very jolly chap who just wanted the vehicle number in several places. We'd had it engraved on the chassis but that wasn't enough. So, he told us what to do but we have to wait for another appointment and drag the caravan down to Auch again (about 1 hour away).
There was a really good medieval evening in Montreal where they handed out free medieval dress and there were lots of medieval happenings - very jolly, but we had to get back and cook!
There's another in 2 week's time and a series of Thursday evening walks which we're going to. Will keep you posted.
Subscribe to:
Posts (Atom)













